General description
Arctic communications center is designed for accommodation of integrated communications equipment in hard climatic conditions of the North. Due to full factory readiness, the Communication center commissioning is 2-3 working days under condition onsite utility systems are ready.
Technical information
MDSPC/CDSPC Total area (sq. m) |
70 |
MDSPC/CDSPC total usable power (kW) |
17 |
MDSPC total power (kW) |
36 |
The number and dimensions of racks installed in MDSPC/CDSPC |
4 |
Average power per rack (kW) |
4,25 |
Maximal power per rack (kW) |
4,25 |
Cooling system assembly |
Single-unit precision conditioners |
Cooling system redundancy scheme |
N |
Assembly of uninterruptible power supply system |
Modular |
Power supply system redundancy scheme |
N+1 |
GES assembly |
Bolid, spray |
Monitoring system |
No |